Industrial Engineering :

In IE, our work expanded into responsibilities, which includes the
development of most efficient methods & processes, enabling to cross the existing benchmarks with new records of productivity and reduction in the level of worker fatigue. We are there to support in optimising the complexity by analysing, redesigning, & implementing solutions for improving manufacturing efficiency, factory layout, processes, and profitability of the existing operations.

Sidebar Menu

🔹Domain

  • 📌 RFQ Management
  • 📌 Industrial Engineering
  • 📌 Plant Engineering

1. Time and Motion Study

Analysing the duration and actions of specific
tasks by observing the contributors like Man, Machine, Method, & Material. It helps in streamlining the inefficiencies and bottlenecks which in turn increasing the productivity.

We as a team uses known techniques like Videography, Method-Time Measurement, & Work sampling for statistical analysis. We work in finding the efficient solutions for bottlenecks, operator inefficiency, inefficient workflows, & physical stress.

2. Lean Manufacturing

Focuses on improving the processes by analysing the whole value stream. Target is to maximise the value and minimise the waste. We help our clients to deliver the optimised value to their customers. We can be support in Data collection and analysis, advanced manufacturing techniques, machine learning, schedule optimisation, resource allocation, capacity calculation, machine availability, material availability.

Production time studies for the understanding of inventory management, material processing, material handling, on time material supply to the processing lines, and factors that can help in reducing wastes for better efficiency in production with the use of lean manufacturing tools.

We support in line balancing by balancing the workload amongst employees and machines. We work on the downtime reduction ensuring the maximum availability of the resources for maximum capacity utilization. We ensure the optimum number of resources required whether it is Man or Machine to complete the assigned task.

3. Facility Layout

We work on the making of multiple layouts considering multiple scenarios.  It goes through the proper channel of approval hierarchy at the customer end to have consensus of all key-stake holders, who will be taking it forward for the successful implementation, with maximum output. 

Layouts are based on the principles of ergonomics considering shortest lead time, maximum efficiency, effective space utilization, minimal material flow, clear understanding of input and output at each location, multi tasking for minimal workforce, & efficient material handling. 

All of the values are pivoted with a common center of workforce safety and ease, so that the work force efficiency can be taken to the maximum.       

4. IE Key-services

With the motive of operational excellence we are here to support with the following services :

    1. Facility Planning and Layout
    2. Manpower Planning
    3. Material Handling
    4. Cycle time Optimisation
    5. Capacity Assessment and Utilization
    6. CAPEX Management
    7. Asset Management
    8. Making of Budget